A repaint where most of the money went before any paint did
Karori, Wellington
- Service
- Exterior repaint
- Property
- Weatherboard, roughly fifteen years since last coat
- Key factor
- Prep, not paint
The situation
The south elevation was flaking and the household had three quotes that varied by thousands with no visible explanation. The cheap quote and the expensive quote described the same finished result, which made the decision impossible.
What happened
The enquiry captured substrate, rough square metres, surface condition and whether scaffolding was needed, so the painter could quote prep and coating as separate lines rather than one number. That made the difference between the quotes legible: the cheap one had assumed a wash and a coat.
Why it mattered
Two full days went on prep before any paint. That is the part households do not see and do not want to pay for, and it is also the part that decides whether the job lasts five years or fifteen. Itemising it is what let the customer choose knowingly.